Compartments No. | 3 chambers |
Valid Volume | 10 000/15 000/15 000 L |
Body Steel Material | Carbon steel |
Manhole | ø500mm(20”) manhole with aluminium alloy cover; with breather valve; with dipstick |
Discharge Valve | 3 |
Foot Valve | 3 pneumatic control foot valves |
Pipeline At Bottom of Tank | 3” steel tube/ Q235 for each chamber |
Ladder | 1 unit at the rear of tank, flat steps, |
Walkway Platform | On the top of tanker; bolted, detachable type; with anti-slip painting and quartz sand |
Discharge Hose Box | 2 units, each side 1 unit, steel, cylinder tube with covers on both ends; with guide wheel |
Discharge Hose | 2 units 3”×6M factory PVC hose with quick coupling on both ends |
Fire Extinguisher Carrier | 2 units at the left of rear of tanker, include 2 units 10kg dry powder type fire extinguisher inside |
Anti-static System | Anti-static mop: 4 units in total; 2units put at the back of tanker; the other 2units put at the beside of landing gear; 1set flexible wire carrier; 12pcs sheet copper |
Spare tire carrier | 2 units |
Main Beams | Heavy duty and extra durability designed; Opting for high tensile steel, welded by automatic Submerged-Arc processes. Welded “I” beam. |
Axle | Original FUWA 13tons heavy duty axle |
Landing Gear | Two speed manual operation JOST 19” linked landing gear |
King Pin | One unit 2” bolt-in kingpin |
Suspension | Mechanical spring suspension |
Wheel Rim & Tires | 9.00-22.5 rims & 12R22.5 tires, |
Electrical Wire | One unit 24V 7-pin ISO 1185 socket; One set 7-pin wire; LED lights system |
Pneumatic Braking System | 4 relay valve; 4pcs T30/30 spring brake chamber; 2pcs T30 spring brake chamber; 2pcs reliable local brand 45L air tank; 2pcs reliable local brand standard coppery air-connector. |
Bumper | 1set, at the end of tanker |
Tool Box | 1 unit tool box in the middle of tanker; |